Gemini 2.5 Flash API Pricing

Google — current verified pricing, stamped 2026-09-07.

Input per 1M tokens$0.3
Output per 1M tokens$2.5
Cache read per 1M tokens
Statusactive
Sourceofficial pricing page · verified 2026-09-07

Audio input $1.00/MTok.

Example costs

  • One request (2,000 in / 500 out): $0.0019
  • 100K such requests/month: $185
  • 1M input + 1M output tokens: $2.8

Compare against other models →

How Gemini 2.5 Flash compares on rate

Gemini 2.5 Flash runs $0.3 input / $2.5 output per MTok — a combined $2.8 for 1M tokens each way. The cheapest active model in our table, Gemini 2.5 Flash-Lite at $0.1/$0.4 (combined $0.5), is about 82% cheaper on combined rate (verified 2026-09-07).

Per-token rate is not per-task cost — tokenizers differ between model families, so benchmark with your own payloads before switching.

What real volumes cost at Gemini 2.5 Flash rates

Straight rate-card math at the verified $0.3/$2.5 per-MTok prices, assuming a 75% input / 25% output token split — no caching or batch discounts applied.

VolumeSplitCost at Gemini 2.5 Flash rates
100K tokens in a day75,000 in + 25,000 out$0.0850
That pace over a 30-day month (3M tokens)2.25M in + 750K out$2.55
1M tokens in a month750,000 in + 250,000 out$0.8500
Heavy month — 12M tokens9M in + 3M out$10.20

Change the split or volume in the calculator — same verified rates, your numbers. Method + the corrections that make estimates real: how to estimate LLM API costs.

Frequently asked questions

What does Gemini 2.5 Flash cost per million tokens?

Gemini 2.5 Flash costs $0.3 per 1M input tokens and $2.5 per 1M output tokens on the Google API (verified 2026-09-07).

How much does 100K tokens a day cost on Gemini 2.5 Flash?

At a 75% input / 25% output split, 100K tokens costs about $0.0850 at Gemini 2.5 Flash rates — about $2.55 over a 30-day month. That is straight rate-card math, before any caching or batch discounts.

Is there a cheaper model than Gemini 2.5 Flash?

Yes — the cheapest active model we track is Gemini 2.5 Flash-Lite at $0.1/$0.4 per MTok, a combined $0.5 against Gemini 2.5 Flash's $2.8 — about 82% less on combined rate (verified 2026-09-07). Tokenizers differ between families, so benchmark per-task cost with your own payloads.

How much do 1M input + 1M output tokens cost on Gemini 2.5 Flash?

$2.8 — $0.3 for the input million plus $2.5 for the output million, at Google rates verified 2026-09-07.

Related models